Equipment layout and installation: Reasonable planning to improve production efficiency
The equipment layout and installation of an efficient brick-making factory or production workshop is by no means a simple "placement", but a careful design and optimization of the production process. Reasonable planning can significantly improve efficiency, ensure safety, and reduce costs. Here are the core ideas for achieving this goal.
1. Follow the production process and establish a clear "assembly line"
This is the first principle of layout design. The order in which the equipment is placed must completely match the natural flow of the production process.
Ideal moving line: raw material stacking area → loading/mixing area → brick forming area → brick curing area → finished product stacking/loading area.
Layout goal: Ensure that the flow of materials (raw materials → wet bricks → finished bricks) is one-way, continuous, and short-distance, and avoid backtracking or cross-carrying. This minimizes wasted labor and transfer time, making the production process as smooth as a flow. The most common layout is the "straight-line" or "L-shaped" straight line layout.
2. Ensure operating space and reserve safety and maintenance channels
There must be sufficient space around the equipment, which is directly related to the safety and comfort of the operator and the maintainability of the equipment.
Operating space: Sufficient space must be reserved at key locations such as the feed port of the mixer, the console of the brick making machine, and the brick outlet to allow the operator to operate and observe safely and conveniently.
Maintenance and inspection access: The area around the equipment, especially the back and sides, must not be close to the wall or piled with debris. Sufficient working access must be reserved for routine maintenance, troubleshooting and component replacement. A good rule of thumb is to consider whether a technician can easily get around to the back of the equipment with their tools.
Safety passage: clear and smooth main pedestrian and logistics passages must be set up and maintained at all times, and the width should be sufficient to allow handling trolleys or forklifts to pass safely.
3. Optimize material storage and transfer paths
The storage location of raw materials and finished products directly affects work efficiency.
Load raw materials nearby: The storage area for sand, stone, cement and other raw materials should be as close as possible to the loading port of the mixer to shorten the loading distance and reduce labor intensity. Consider using a small forklift or simple conveyor belt connection.
Wet bricks must be cured nearby: Freshly pressed wet bricks are extremely fragile. The curing area (resting area, awning) must be close to the brick outlet of the brick making machine. It is best to be directly connected through a roller or conveyor belt to achieve "curing as soon as you get off the machine" and minimize manual handling and damage.
Finished products are close to the exit: The finished product stacking area should be set up close to the transportation road or loading platform to facilitate the quick shipment of the final product.
4. Match power and public facilities to ensure stable supply
Equipment operation is inseparable from reliable energy and supporting facilities.
Power layout: Based on the total power of the equipment, plan reasonable cable routing and distribution box locations to ensure voltage stability and avoid overlong or overloaded lines. Power lines should be laid safely and regularly.
Water source and drainage: Mixing and curing require a large amount of water, and the water source should be easily accessible. At the same time, the site (especially the mixing area and curing area) must have a good drainage system to prevent water accumulation from affecting production and safety.
Environmental control: The curing area needs to consider sunshade, rain protection and ventilation to create a stable curing environment for the bricks.
5. Balance flexibility and future development
The layout should be flexible enough to accommodate changes.
Reserve space for expansion: Reserve an appropriate space at one end or side of the production line to prepare for adding equipment and expanding production capacity in the future.
Flexibility in equipment layout: Where possible, adopt a relatively modular layout so that the location of major equipment can be adjusted when necessary.
In summary, the core goal of reasonable equipment layout and installation is to create an "efficient, safe and smooth" production line. You can check that your layout is sound by asking yourself a few questions: Is there any crossover or backflow of material flow? Is there enough space for operation and maintenance? Is the transportation distance between raw materials and finished products the shortest? Is it easy to use water, electricity and drainage?
Spending more time in the planning and installation stages will result in great efficiency and convenience in long-term production operations. A good layout is a silent promoter of productivity.